DESCRIPTION
Wire kit 3m for Trunk . First fixing point starts at 100-800 mm. Recommended distance between fixings is maximum 2000 mm. At 2m distance, the number of fixing points per stretch is the total length of the stretch in meters divided by 2m + 1 piece. Diameter of holes in concrete ceiling: ø10mm, but should be checked before starting.